project description
Location was chosen beyond the existing park adjacent to the high school The hall is its additional closure thus adding spatial value. The building is situated on a slope and makes use of the vertical difference of the terrain. The aisle as well as the direct entrance to the auditorium are above the level of the hall's playground and above auxiliary facilities which also serve the outdoor playground.
project facts
Site area: 2,5 ha
Usable floor area: 3269 m2
Total area: 3948 m2
Volume: 25 737 m3
Design: 2002-2003
Construction: 2004-2006
Cost of investment: (building and outdoor sportfacilities) 15 mln PLN
authors
Krzysztof Banaszewski
Jan Strumiłło
Jakub Szczęsny
Ryszard Szczęsny
foto:
Błażej Pindor